References:

    • Rütenbrock 6 Z b: Re-entry gas well (sidetrack; 3800 m TD), Drilling Engineering, Tendering, Drilling Operations Management for Wintershall

    • Ratzel Z 1 b: Re-entry gas well (sidetrack through 2 casing strings; 2470 m TD), Drilling Engineering, Tendering, Drilling Operations Management for Preussag Energie

    • Leer Z 3 a: Sidetrack of deep gas well (sidetrack through 2 casing strings; 4690 m TD), Drilling Engineering, Tendering, Drilling Operations Management for Preussag Energie

    • Gas-Storage Kalle: 2 storage wells: (horizontal wells; 2355m resp. 2460 m TD), Drilling Consulting, Drilling Operations Management for VEW Energie

    • Japanese Ultra-deep Drilling and Geoscientific Experiments Project (JUDGE): Contribution of Chapters (Evaluation of KTB-experience, recommendations for proceeding in JUDGE-project) to feasibility-study with international participation for Japanese Geological Survey/Japanese Metal and Chemical Corporation (JMC)

    • Rieth 1: Re-evaluation of a casing 2-stage cementation (part of an investigation of potential hazards of a CBM-project for CONOCO)

    • Gas-Storage Kalle: Re-evaluation of existing wells concerning cementing quality and performance (part of an investigational study of possible storage leaks) for VEW Energie

    • San Andreas Fault Zone Drilling Project: Evaluation of drilling concept , budgeting for GeoForschungs-Zentrum Potsdam (GFZ)

    • Volkenroda FL Vo 97: Flooding well for old potassium mine (directional well, 4 m target, 1007 m TD), drilling engineering, -operations supervision and management for GVV

    • Cavern Storage Teutschenthal: 4 cavern wells (3 wells for new caverns, 1 in existing cavern; 800 - 1200 m TD): drilling operations supervision and management for BSL

    • Cavern Storage Project "Reckrod": Drilling of 4 new wells, and completion of 2 old wells: Drilling consulting for GASUNION and PLE/Daldrup, participation in tendering

    • Study "Investigation of Multi-Lateral Drilling & Completion-Technique as a Possible Alternative to Frac-Treatment in Deep Tight Gas Reservoirs" for Wintershall

    • Study "Evaluation of Alternative Well Design Concepts for Deep Gas Wells in the Emsland-Area" for Wintershall (well with alternative design was successfully implemented in late 1997)

    • Cavern Storage Ohrensen: 3 new wells: Drilling consulting for DOW Deutschland Inc.

    • Gas Storage Bierwang: "Feasibility of Storage-Improvement by a Horizontal Side-Track of an Existing Well": Participation in elaboration of study for Ruhrgas/PLE (elaboration of drilling related part)

    • Gas Storage Bierwang: New storage well: Drilling consulting (trouble shooting) for Ruhrgas/PLE

    • Study "Feasibilty of Investigating the Geology for a Planned High-Speed Train Tunnel below a Disposal Ground by Drilling a 600 m Long Horizontal Well" for ATAC/DMT (elaboration of drilling related part)
       

    • Verden Ost Z 1: Evaluation of different feasible technical alternatives, elaboration of complete technical detailed planning for Wintershall
       

    • Emtinghausen West Z 1: Evaluation of feasible technical alternatives, drilling engineering for Wintershall

    • Barrien 5T a: Feasibility Study of a "Minimum Cost Sidetrack" for Wintershall

    • Prinos PA-29: Sidetrack of an existing production well (2 targets), feasibility-study, drilling engineering, supervision for Kavala Oil S.A., Greece

    • Prinos PA-30: Sidetrack of an existing production well (4 targets), feasibility-study, drilling engineering, supervision for Kavala Oil S.A., Greece

    • Prinos PA-31: Sidetrack of an existing production well (4 targets), drilling engineering, project management & supervision for Kavala Oil S.A., Greece

    • Prinos Epsilon 1/1a: Drilling engineering of exploration well for Kavala Oil S.A., Greece

    • Kallirachi 1: Drilling engineering of exploration well for Kavala Oil S.A. (in progress)

    • Georgsdorf 121 a: Drilling engineering for BEB Erdgas & Erdöl GmbH

    • Peckensen 179 a: Drilling engineering, review of work schedule for EEG Erdgas Erdöl GmbH

    • Salzwedel 125 a: Drilling engineering, review of work schedule for EEG Erdgas Erdöl GmbH

    • Salzwedel 132 a: Drilling engineering, review of work schedule for EEG Erdgas Erdöl GmbH

    • Carrico Gas Storage Project: Re-evaluation of casing cementations for KBB/Transgas

    • Geothermal Project Bremerhaven TEWS: Drilling-related consulting for the project management of swb Stadtwerke Bremen/Bremerhaven (in progress)

    • Geothermal Project München-Riem: Drilling-related consulting and engineering for the project management of SWM Stadtwerke München via a joint cooperation with Erdwerk (in progress)
       

    • Study „Lund DGE 1 – Analysis of Technical Situation and possible Reasons for Stuck Pipe” for KCA Deutag Drilling GmbH, Bad Bentheim
       

    • Study “Feasibility of Usage and preferred Modifications of existing Wells in a German Gas Storage in Combination with higher Storage Pressure” for RWE-DEA, Hamburg
       

    • Investigation “Actual State of and necessary Work on existing Wells of an old Oil- and Gasfield for future Use as Underground Gas Storage” for BEB/EMPG, Hannover
       

    • Investigation & Evaluation “Available Safety Factors of the Anchor Casing Strings of the Gaswells in N-Germany” for BEB/EMPG, Hannover
       

    • Theoretical Investigation & Evaluation “Investigation of Actual State of Fluids in Annulli and possible Impact on Well Integrity” for EMPG, Hannover
       

    • Investigation & Evaluation “Available Safety Factors of the Anchor Casing Strings of  Gas Storage Wells in Berlin” for GASAG, Berlin
       

    • Investigation & Evaluation “Available Safety Factors of the Anchor Casing Strings of selected  Wells in Germany” for  Gaz de France, Production & Exploration Germany, Lingen
       

    • Investigation & Evaluation “Available Safety Factors of the Anchor Casing Strings of the Gaswells in N-Germany” for RWE Dea Production Dept. Lower Saxony
       

    • Gas Storage Project Tschech Republik: Drilling Engineering, consulting and tendering of 12 new wells for RWE Gas Storage s.r.o., Prag
       

    • Gas Storage Project UK: Drilling Engineering, consulting and tendering of 10 new wells for RWE Energy AG, Dortmund
       

    • Geothermal Project Offenbach/Queich: Drilling Engineering, consulting and drilling supervision for HOTROCK, Karlsruhe
       

    • Geothermal-Projekt Mauerstetten: Drilling Engineering, consulting and tendering for Geothermie Allgäu/EXORKA Intl., München
       

    • Geothermal-Project Peiting: Drilling Engineering, consulting and tendering for GreenEnergy, Hannover
       

    • Geothermal-Project Taufkirchen: Drilling Engineering, consulting and tendering for Geotec Consult, Markt-Schwaben
       

    • Geothermal-Project Erding: Drilling Engineering, consulting and tendering for Geotec Consult, Markt-Schwaben
       

    • Geothermal-Project Utting: Drilling Engineering and consulting for Aufwind Schmack GmbH, Regensburg
       

    • Geothermal-Project Bernried: Drilling Engineering and consulting for Bernried Erdwärme AG, Bernried
       

    • Geothermal-Project „Sonnengarten GTB“ Zürich/CH: Drilling Engineering for Daldrup & Soehne AG, Ascheberg; consulting and project follow-up for ewz Elektizitätswerke Zürich/CH
       

    • Several deep geothermal wells: Particular Drilling Engineering for various customers (casing design, T/D-calculations, borehole hydraulics, min. rig requirements, etc.)

Numerous Wells On-Shore: Drilling supervision for various customers (Operator Toolpusher), e.g.

BEB (various gas- and gas storage wells)
Preussag Energie (various oil- and gas wells)

-           Ruhrgas (gas storage Sandhausen)
-           Saarferngas (gas storage Frankenthal)
-           VEW Energie (gas storage Kalle)
-           Wintershall (gas storage Rehden; oilfield Emlichheim)
-           Kavala Oil (oilfield offshore Greece)

Elaboration of an Equipment- und Service-Review Manual as part of a Quality Management System for Optimization   of Drilling Projects for the companies BEB, Mobil, OMV, Preussag, RWE-DEA, and Wintershall

Elaboration of a Recommendation for the optimized Use of Drillstring-Connections  under High Combined Loads, with special target to ERD-wells for DEUTAG Europe

Technical Feasibility Study ”Energy- & Fluid Transport in Fault Zones of the Continental Crust at the KTB-Location” for German Research Foundation (DFG)

Several Technical Expertises for various customers (operating companies, service companies, insurances, Mining Authorities,...)

Several Wells On- and Off-Shore: Evaluation of  borehole circulating temperature BHCT) from circulation experiments before running casing/liner, recommendations for preparing and performing critical cementing jobs

Educational Seminars: Several drilling related courses, held at the ”Drilling School Celle” (e.g. 3 courses for high-level Chinese delegations from The Ministry of Geology and Mineral Resources, Chinese Academy of Geological Sciences, National Research Center)

 

ASDES Customer list:

                    

Delivery of

           

Customer

Location

Country

Contact Person(s)

                           

drill bits,

OCTG,

other equipment

                                                                                                             

core bits

acces.

ACE Downhole Tools & Services

Wijchen

NL

Mr.

Knighting

X

                                

Baker Hughes Inteq

Celle

D

Mr.

Oldach

X

                             

Baker Oil Tools

Celle

D

Mr.

Krüger

 

X

                  

Becfield

Edemissen

D

Mr.

Beilner, Burger

X

X

                  

Bohrgesellschaft Rhein-Ruhr

Herten

D

Mr.

Müller-Ruhe, Jatho

X

X

valves

Buna Sow Leuna Olefinverbund

Teutschenthal

D

Mr.

Gerhardt

X

X

flanges

Karl Daldrup GmbH

Ascheberg

D

Mr.

Daldrup, Naber

X

X

                   

Deep Drill B.V.

Heerhugowaard

NL

Mr.

Molenaar

          

X

               

DEUTAG

Bad Bentheim

D

Mr.

Chur

X

X

HWDP*

DOW Deutschland Inc.

Ohrensen

D

Mr.

Grotowski

X

X

                 

DSK

Saarbrücken

D

Mr.

Kaltwang, Cox

X

X

well head

Drilling Contractor & Service Co.

Szolnok

H

Mr.

Schwendtner

X

                                

Dynamit Nobel

Troisdorf

D

Mr.

Jacobs

         

X

                

East-West Bridge Ltd.

Budapest

H

Mr.

Szabo

X

                             

E + M Bohr GmbH

Hof/Saale

D

Mr.

Etschel, Trätzl

X

                           

Foralith AG

Gossau

CH

Mr.

Dr. Berli

X

                              

Halliburton A.S.

Mongstad

N

Mr.

Travis

X

           

hole openers

KBB

Hannover

D

Mr.

Pilchowski

            

X

  

Maschinenfabrik J. Wagner

Mülheim

D

Mr.

Schreiber

              

X

                  

MITCO

Budapest

H

Mr.

Taglialegne

X

                              

Mobil Erdgas-Erdöl GmbH

Celle

D

Mr.

Tschaffler, Pust

X

                               

Mobil Erdgas-Erdöl GmbH

Lesum

D

Mr.

Schultz

             

X

                            

Nafta Gbely

Gbely

Slowakia

Mr.

Marcin

X

                         

NORMEC

Celle

D

Mr.

Heginger

                       

valves

ODESA S.R.L.

Budapest

H

Mr.

Bela

                        

fishing tools

Preussag Energie

Lingen

D

Mr.

Wagner, Lücke

X

X

drillstring*

Preussag Energie

Edemissen

D

Mr.

Flixeder

              

X

   

Preussag Meß- & Wireline Service

Edemissen

D

Mr.

Schröder, Kater

                        

CDC-charges

Rohöl-Aufsuchungs AG

Kremsmünster

A

Mr.

Kronsteiner

X

X

                       

Rotary Drilling Ltd.

Nagykanizsa

H

Mr.

Dr. Meidl

X

                               

R.B.S.

Wijchen

NL

Mr.

Mimpen

X

X

               

Saarberg AG

Saarbrücken

D

Mr.

Kaltwang, Cox

X

X

sucker rods

Solexperts

Schwerzenbach

CH

Mr.

Dr. Bühler

                           

test string

TIEBO

Emlichheim

D

Mr.

Thies, Westra

X

                            

UGS

Mittenwalde

D

Mr.

Kuba, Pludra

X

        

DC-subs          

Versorgung & Verkehr Kiel GmbH

Kiel

D

Mr.

Möllenbeck

              

X

drillstring*           

VEW Energie

Dortmund

D

Mr.

Below

             

X

    

Weatherford

Hannover

D

Mr.

Kinzel, Krauledat

              

X

                     

Wintershall AG Erdölwerke

Barnstorf

D

Mr.

Krug

X

X

                         

Wintershall Libya

Tripoli

Libya

Mr.

Primus, Dr. Halm

X

X

                           

*Leasing equipment 

back